Spokane Tribal Hatchery Fish Production Well Variable Frequency Drive Replacement

RFP26-001 Hatchery Well #4 VFD Replacement_TPEdit1_10.17.2025

The Spokane Tribe of Indians (STOI) is requesting total cost proposals from qualified contractors
to replace a fish production well variable frequency drive (VFD) at the Spokane Tribal Fish
Hatchery.
There are no expressed or implied obligations for the SPOKANE TRIBE OF INDIANS to
reimburse responding firms for any expenses incurred in preparing proposals in response to this
request. Your proposal and proposal amount shall remain valid for a period of ninety (90) days
from the closing date.

 

II. SCOPE OF REQUESTED SERVICES
STOI Spokane Tribal Fish Hatchery is in need of replacing an existing variable
frequency drive controlling a 50 hp fish production well pump with a new one. Work will
include removable of the existing drive and replacing with new one per ALL technical
specifications and aspects as listed in Attachment B – Hatchery Upgrades Design
Project – Well #4 VFD Replacement Volume 1