Boys and Girls Club Roof Replacement Project

Click here for entire RFP: RFP25-019 B&G Club Roof replacement

The Spokane Tribe of Indians (STOI) is requesting proposals from qualified contractors to perform a complete roof replacement at the Boys and Girls Club facility. The project includes removal and replacement of both the shingle roof system and the flat membrane roof system. Work must be performed to manufacturers and building code standards, with warranties provided. There are no expressed or implied obligations for the SPOKANE TRIBE OF INDIANS to reimburse responding firms for any expenses incurred in preparing proposals in response to this request.  Your proposal and proposal amount shall remain valid for a period of ninety (90) days from the closing date.

I.   SCOPE OF REQUESTED SERVICES

  • 1.    Shingled Roof Area

    • • Remove and dispose of all existing shingle roof layers.
      • Remove and dispose existing 2″ insulation board beneath shingles.
      • Furnish and install H–Shield NB 2inch (Flat Polyisocyanurate Insulation Manufactured On-Line to Oriented Strand Board) or comparable.
      • Install complete shingle roof system including:
      • Architectural Shingles
      • Roof deck protection.
      • Ice and water shield at eaves (per code).
      • Pipe flashing, wall flashing, drip edge, valley metal, starter shingles, skylight metal flashings, and ridge cap.
      • High-quality roofing nails (no staples).
      • Replace rotten or damaged sheathing at unit price per sq. ft. (to be included in bid).
      • Special condition on western slope shingle area with skylights
      • Remove recently installed shingles only (SIP panels 1 ½” with attached OSB remains in place as it was already replaced)
      • Install new shingles
    • 2. Flat Membrane Roof Area
      • • Apply field cuts to existing membrane to allow proper breathing” and remove existing wall/curbs membrane.
        • Install mechanically attached 1/2” HD coverboard over top of existing membrane roof (fire code compliant).
        • Install mechanically attached 60 mil TPO membrane roof system, fully adhered at walls/units.
        • Install drip edge flashings at perimeter walls (color to be selected by owner).
    •  3. General Work Requirements
      • • Sweep yard with magnet to pick up loose nails/staples.
        • Remove and haul all excess materials.
        • Obtain all necessary permits.
        • Provide cleanup and site restoration after completion.
        • If toe boards are installed ensure that no fasteners will penetrate through the ship lap roof decking.

Click Link above for entire RFP.