Spokane Tribe Logo

5 Homes Construction-Updated

Click here for entire RFB: STOI 5 Homes Construction for Bid – Final

Click here for Addendum #1

Plans – 1-5 Elevations 37-27

Plans – 2-5 Floor & Fndn Plan 37-27

Plans – 3-5 Elect & Fl Joist 37-27

Plans – 5-5 Bldg Section 37-27

Plans – 37-14 1-3 Elevation 1014-B

Plans – 37-14 2-3 Floor & Foundation 1014 FP

Plans – 37-14 3-3 Roof & Cabinet 1014 RP

Materials List 1

Materials List – Trusses

Pre-Bid Walk Agenda

Kokanee Site 14 6.25.24

Kokanee Site 13 6.25.24

Kokanee Site 20 6.25.24

McCoy Lake Site 6.25.24

Electrical Proposal

Exterior Color Schemes

HVAC Heat Pump Proposal

Kokanee Meadows As Built

Click Here for Addendum #2: Addendum #2

Lighting Schedule (1)

Lighting Schedule

 

PURPOSE

Full construction services to build five (5) 2-bedroom, 1-bathroom homes on the Spokane Indian Reservation. Four (4) will be built in Ford, WA and one (1) will be built in West End, WA.

INTRODUCTION

The SPOKANE TRIBE OF INDIANS (Spokane Tribe, STOI, and Tribe) is requesting sealed Firm-fixed priced bids from reasonable, responsive, responsible, vendors for, construction services to build 5 new homes on the Spokane Indian Reservation. Four (4) of the homes will be constructed at our Kokanee Meadows housing property in Ford, WA (, and the other one (1) will be built at our McCoy Lake housing cluster in Fruitland, WA. All contract provisions in Appendix II to 200 within 2 CFR chapter 1 & 2, part 200 rules and regulations are incorporated by reference. This project involves federal funding and all federally-required General Conditions will be made part of the final contract between the Spokane Tribe of Indians and the final awarded vendor.

SCOPE OF WORK

 In addition to any other required items mentioned in this RFB, please include the following items in your sealed bid:

  1. Proposed Project Schedule
  2. Schedule of Values with Total Project Cost

Contractors will be responsible to construct, from plans in place, the below according to Washington State Residential Building Standards:

  1. Pre-Construction Phase:
    1. Project Planning:
  2. Develop a detailed project plan outlining key activities, milestones, and timelines.
    1. Procurement:
  1. Utilize the materials list attachment. Materials used must be similar or equal to what is listed. This includes any materials required for completing the work outlined in section 2 below.
  2. Identify local and minority-owned businesses for subcontracting opportunities as per TERO Requirements outlined in the General Information section……

 

Click the above link for full RFB.